Wiremap 1.02

Since I quit my day job, I’ve been focusing most of my efforts on building the second version of the Wiremap. Here’s a video explaining the process of a big Wiremap.
YouTube Preview Image

This was filmed about a week ago. Since then I’ve drilled all 256 holes and sanded it down. In order to elevate the large piece of plywood, I constructed four booms. Take a look:

The boom is a vertical iron bar stuck inside a ready-mix concrete base. The container is a modified bed riser (here are some images as an example of what I mean by that), with the tops cut out with a jigsaw.
And here’s just one of em:

So after I mixed the cement and poured it into the bed risers, I propped up the metals bars using a level, making sure the bars were sticking straight up.

And here’s a close-up of the base:

The cement is still drying, so I’m going to wait another day before I set up the planks. Sometime in the next couple of days, though, I should be able to drop the strings and get a first draft up and running.

This entry was posted in Wiremap. Bookmark the permalink.

One Response to Wiremap 1.02

  1. Eric says:

    Um, is this a personal blog? I didn’t know, so I decided to post anyway… can I crash at your place in like June of 2007 for like a week… errr 2? Errr whatever. Oh, this is Eric, from Eric and Andrew.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Powered by WP Hashcash